Short answer: if your addition changes how the house carries load, you need a structural engineer — and your building department will require one's drawings before issuing a permit.

When you definitely need one

  • Removing or altering a load-bearing wall — the classic case. The engineer sizes the replacement beam and its supports.
  • Adding a second story — the existing foundation and framing must be verified for the new loads.
  • New foundation or slab for the addition, especially on expansive or fill soils.
  • Long spans: open-concept great rooms with 20ft+ clear spans need engineered beams or posts.
  • Hillside or retaining conditions — lateral loads and drainage change the design completely.

When you might not

A small non-structural bump-out (like a bay window within existing framing) or purely cosmetic work sometimes goes through with architectural drawings only — but the final call belongs to your city's plan reviewer, not the contractor. When in doubt, ask before you build.

What the engineer actually delivers

  • Structural calculations proving the new framing works (gravity + lateral).
  • Framing plans, beam/post schedules and connection details.
  • Foundation design for the new footprint.
  • A PE-sealed set your city will accept — see how sealing works in Texas, Florida and all 50 states on our coverage page.

Planning an addition? Send the existing plans — we will tell you exactly what engineering your city will ask for.